logo

11-W-4, 15-W-4 and 19-W-4 are all welded bar grating panels with cross bars at 4 in. (100 mm) on centre. The only difference is how far apart the bearing bars sit: 11/16 in. (17.5 mm), 15/16 in. (24 mm) and 1-3/16 in. (30 mm) respectively. That one number decides open area, self-weight, how many bars carry the load, and what can fall through the floor — which is why mesh selection should be made before bar size, not after.

 

What the Code Tells You

 

Code digit

Meaning

11-W-4

15-W-4

19-W-4

First number

Bearing bar spacing in 16ths of an inch

11/16 in. (17.5 mm)

15/16 in. (24 mm)

1-3/16 in. (30 mm)

Letter

Construction type

W = welded

W = welded

W = welded

Last number

Cross bar spacing, inches

4 in. (100 mm)

4 in. (100 mm)

4 in. (100 mm)

 

 W is electro-forge resistance welding with no filler metal, the standard industrial build. S is swage-locked and P is press-locked, both used where an architectural look or a flush top surface matters. R is riveted. All four share the same spacing code, so "11-W-4" and "11-P-4" have the same mesh but different construction, stiffness and price.

 

Mesh Comparison

 

Designation

Bearing bar spacing

Open area (approx.)

Relative bar count per foot

Best for

19-W-4

1-3/16 in. (30 mm)

about 80 %

Baseline

General industrial platforms, drainage per kg

15-W-4

15/16 in. (24 mm)

about 75 %

Higher

Higher point loads, tighter heel safety

11-W-4

11/16 in. (17.5 mm)

about 70 %

About 70 % more bars than 19-W-4

Pedestrian routes, public access, dropped-object control

11-W-2

11/16 in. (17.5 mm)

about 70 %

Same mesh, cross bars at 2 in.

Extra lateral rigidity, non-standard lead time

 

Prices

 

A tighter mesh buys safety and costs steel. An 11-W-4 panel carries roughly 70 % more bearing bars per foot than 19-W-4 at the same bar size, so it weighs more per square metre — a 1 in. × 3/16 in. 11-W-4 panel is around 15 lb/ft² (≈ 74 kg/m²) before galvanizing. It also drains slightly less, because open area falls from about 80 % to about 70 %. What you get in return is a floor that a heel, a wheeled bag or a dropped spanner will not vanish through, and more bars sharing every concentrated load.

 

Span Planning

 

Bearing bars must run across the span. Indicative clear spans at 5 kPa (100 psf), L/200 deflection:

 

Bearing bar

Indicative clear span

1 × 3/16 in. (25 × 5 mm)

≤ 900 mm

1-1/4 × 3/16 in. (32 × 5 mm)

≤ 1,050 mm

1-1/2 × 3/16 in. (40 × 5 mm)

≤ 1,200 mm

2 × 3/16 in. (50 × 5 mm)

≤ 1,500 mm

 

 

These are conservative planning figures, not a substitute for a load table. Ask for the table for your exact span, load case and deflection limit before ordering.

 

When 11-W-4 Is the Wrong Choice

 

Situation

Specify instead

Pallet trucks, forklifts or hard wheels

Heavy-duty welded or press-locked with 1/4 in. bar

Long spans over 1.5 m

Deeper bearing bar, or 19-W-4 with a larger bar

Maximum drainage per kilogram

19-W-4

Budget-driven platform, no public access

19-W-4 or 15-W-4

Accessible route needing openings under 13 mm

Closer mesh or checker-plate panel

 

The rule that saves rework: 11-W-4 is a light-duty pedestrian panel. Tightening the mesh makes a floor safer for people; it does not make it a vehicle deck. Traffic, not mesh, sets the bar size.

 

FAQ

 

Q: Is 11-W-4 stronger than 19-W-4?

A: At the same bar size, the tighter mesh spreads load over more bars, but the panel is still light duty. For heavy loads, increase bar size and thickness rather than tightening the mesh.

 

Q: How much heavier is 11-W-4?

A: Roughly 70 % more bearing bars per foot than 19-W-4 at the same bar size; a 1 in. × 3/16 in. panel is around 74 kg/m² ungalvanized.

 

Q: What does the W mean in 11-W-4?

A: Welded construction, electro-forge resistance welding with no filler metal. S is swage-locked, P is press-locked, R is riveted.

 

Q: Can I mix mesh types on one platform?

A: Yes. Many projects use 19-W-4 for general areas and 11-W-4 over equipment or public routes, quoted from one drawing.

 

Send us your span, traffic type and whether the route is public, and we will recommend the mesh with the reasoning rather than just a price.